Solving Separation Anxiety with Systems Control

One would expect a systems control integrator to understand equipment controls. But what happens when your controls integrator also understands the process? You get an improved production process, reduced maintenance, and more productivity!

A beverage producer in SC uses a separator as part of a hot tea fill process.  The original separator program forced the bowl to spin down when flow was not detected after several minutes.  The customer deemed that the time to spin down and then speed back up to processing speed was too long. He was losing too much production time.

The original integrator who installed the hot fill line changed the separator controls which allowed the separator to spin. Even when tea was not flowing, the separator would spin.  The continuous spin of the bowl created excessive heat; leading to a breakdown of the bowl gaskets. The gasket wear created a flow path around the seals to the solids discharge port on the separator.

The customer then contacted M.G. Newell for help.  Our Newell Automation engineer installed a flow switch and timer on the outlet of the pump feeding the separator.  He added a water circuit that allowed water to flow through the separator and to the drain.  He also programmed the system to allow automated butterfly valves to open when tea flow was not detected for the timer set point.  The water would flow to the separator inlet, through the separator and then dump to drain until the flow switch requirement was met.

After three months, the life of the bowl gaskets has increased 4-fold. The plant no longer has unplanned downtime due to gasket failure.  This has resulted in increased productivity and reduced maintenance costs.

Our Newell Automation team has a goal to understand the purpose behind the process.  They work alongside our process engineers to troubleshoot and streamline the process.  Contact one of our associates today to see how We Make It Work Better.

For additional information, visit our website:  www.mgnewell.com and www.newellautomation.com.

Your Guide to SLC/PLC-5 Migration

Resources to help you assess, plan and implement your migration to the ControlLogix® platform
The SLC/PLC-5 control system is among the largest installed base of any control platform. After 30+ in the Rockwell Automation platform, these systems have been discontinued and replaced by the ControlLogix platform. This high-performance platform allows you to connect your production processes into an integrated plant-wide system. Benefits include:
  • Greater production visibility
  • Improved inventory management, cycle times and quality control
  • Improved capacity and asset utilization
  • Regulatory compliance and reduced exposure to security risks
Our engineers can help you assess, plan and implement a migration: Assess : Assess your current system, current needs and future needs Identify reliability issues, understand cost and time Plan : Work with us to review your options and to develop a migration plan Document scope and benefits of the new system Implement : Execute the developed plan and document the benefits systematically migrating to the ControlLogix platform in phases offers users a way to prioritize their requirements and maintain productivity. Phase I: Application Code Conversion Migration begins by converting SLC/PLC-5 processor code to Logix code. Rockwell’s database conversion tool streamlines the upgrade to the new code. Then, the new 1756-RIO Remote I/O can be used as the network interface to the 1771 Remote I/O over the existing I/O network. Benefits : – Develop and confirm migration plan – Test application code before implementation. Phase II: Replace PLC-5 Controllers Next, while continuing to use the1771 Remote I/O, replace PLC-5 controllers with the Logix PAC and 1756-RIO Module. The same 1756-RIO Module used in Phase I is now configured to perform as the master instead of the monitor. The Logix PAC can now control any I/O that resides in the 1771 chassis. Benefits : – Maintain existing field wiring – Minimize commissioning time and effort – Ability to return to PLC-5 control if needed. Phase III: HMI/EOI Migration Replace existing HMIs or EOIs with FactoryTalk® products. Application Conversion Utilities make operator interface more cost effective and give greater flexibility with the final product. Interfaces can be designed for how operators use the equipment and maximize their productivity. Benefits : 80% of the time no further modification is required Conversion log ID’s features not supported by new hardware – Enhanced features and graphics – Better integration with controllers Phase IV: I/O Replacement Replace the 1771 I/O with the ControlLogix I/O using the I/O Wiring Conversion System. This system provides a method to connect existing 1771 I/O wiring to the 1756 I/O modules without disturbing field wiring connections. Planning is more manageable as racks can be switched one at a time or all at once based on your schedule and budget. During the conversion, both old and new I/O networks can run simultaneously. Benefits – Maintain existing field wiring – Minimize commissioning time and effort – Cross reference documentation to assure correct selection and historical back-up.

The ABC’s of VFDs – A user’s guide to VFD terminology

Keeping up on all the terminology surrounding the usage of variable frequency drives can be daunting, so we’ve prepared a guide to help explain some basic terminology so that you can be a power user of variable frequency drives (VFDs).

A VFD is a device that controls the speed of an electrical motor by varying the frequency and voltage of its power supply. The VFD also has ramp-up and ramp-down capabilities to start and stop the electrical motor smoothly.

Why do we need to control the speed of an electrical motor? Well, there are multiple reasons, most of these that you already know:

  • Save energy and improve system efficiency
  • Reach the desired torque or power for the process requirements
  • Lower the noise levels of pumps, blowers, fans, compressors, etc.
  • Reduce mechanical stress on the machines and improve their life cycle
  • Improve the working environment

There are also new features on today’s VFDs such as CIP safety, preventative maintenance monitoring of drive data to alert maintenance before failure and automatic PID tuning for system changes.

A VFD consists of 3 primary sections: the rectifier/converter, the DC Bus, and the inverter.

The rectifier/converter is the first of the three sections of a VFD’s main power circuit, and first in terms of power flow. Incoming AC line voltage is rectified or converted to DC voltage in the converter section, which consists of diodes, silicon-controlled rectifiers (SCRs), or insulated gate bipolar transistors (IGBTs) connected in a full-wave bridge configuration. One rectifier will allow power to pass through only when the voltage is positive. A second rectifier will allow power to pass through only when the voltage is negative. Two rectifiers are required for each phase of power.

The DC Bus is the 2nd section of a VFDs main power circuit. The main function of this link is to store, smooth and deliver the DC voltage. The incoming power from the rectifier contains voltage ripples which need to be smoothed using capacitors.

The 3rd section of a VFD power circuit is the Inverter. The inverter section of a VFD is the primary difference between an AC drive and a DC driver. This section is comprised of Insulated Gate Bipolar Transistors (IGBTs) which convert the DC voltage back into AC voltage to feed the motor. IGBTs are very fast and very small semiconductor switches that are actuated electronically, thus creating a sinusoidal output current.

The technique used to convert AC voltage and vary the output frequency is Pulse Width Modulation (PWM). PWM is a VFD control scheme in which a constant DC voltage is used to reconstruct a pseudoAC voltage waveform using a set of six power switches, usually IGBTs. Varying the width of the fixed amplitude pulses controls effective voltage. This pulse width modulation scheme works because the motor is a large inductor that does not allow current to pulse like the voltage. Sequenced correctly, PWM outputs motor current in a nearly perfect sinusoidal waveform.

All three of these are controlled by a microprocessor unit that performs numerous functions such as controlling the speed, monitoring the alarms and faults and interfacing the AC drive with different devices using a communication protocol. This means that the user can now control the start/stop function, motor speed control and receive feedback about current, speed, and other motor or device variables.

Soft Starter vs VFD

What’s the difference between a soft starter and a VFD? While the VFD can vary the speed of the motor, a soft starter only controls the starting and stopping of the motor. A soft starter will be cheaper and smaller, however a VFD should be used when a high starting torque is required, or speed control is required.

For additional information, visit our website: www.mgnewell.com or contact us at sales@mgnewell.com.

Control Panel Fabrication – Best Practices for a Panel Builder

Depending on your process, a control panel may be small – designed to control a simple batching process – or complex – designed to control several loops and integrate various pieces of equipment in various locations around your plant. As such, these panels can house an increasing array of devices. In addition, you may want to plan for a future expansion. When selecting a vendor to build your control panels, it is wise to do some homework and check out their work. We’ve put together a few Frequently Asked Questions to help guide you through the process of selecting an automation company to build your control panel.
  1. Are they UL Certified? Do they use UL components? UL is a global, independent safety science company with over 100 years of expertise in safety solutions. UL standards encompass their extensive range of safety research and scientific expertise. Most control panels fall under the UL-508 specification. This requirement covers industrial control panels intended for general industrial use and operating from a voltage of 1000 volts or less.Within this standard, UL-508A is the UL standard for the construction of Industrial Control Panels. It provides guidelines to panel builders on various issues including proper component selection, wiring methods and calculation of short circuit current ratings. A panel that carries the UL-508A listed mark means that the panel, it’s electrical components and construction meet UL-508A standards.Electrical inspectors look for this mark as evidence of third-party certification. This is important to a local municipal inspection authority as well as the panel purchaser. It shows that the panel is compliant with acceptable safety standards.
  2. Do they have other certifications? Other than UL Certifications, most engineers and panel builders also have other industry certifications. Other organizations include CSIA – the Control System Integrators Association and ISA – the International Society of Automation. Both organizations perform independent audits on the panel builder and/or the company and provide a non-biased, objective assessment.CSIA Certified companies have demonstrated through an independent audit that they adhere to CSIA’s comprehensive Best Practices. Key areas covered include not only project management, system development and quality assurance, but also covers the company’s financial health, human resources and marketing and business development.ISA certifies a technician’s skills. Through their Certified Control Systems Technician (CCST) program, they provide an objective assessment and confirmation of a technician’s skills. ISA’s three levels of CCST certification require differing degrees of technical experience, education, and training. CCSTs calibrate, document, troubleshoot, and repair/replace instrumentation for systems that measure and control level, temperature, pressure, flow, and other process variables.
  3. Do they keep their panel building area clean? Keeping your panel building facility clean may sound like a no-brainer, but the benefits of a clean facility go beyond simply clean floors. The most important component of any work environment is its people. By providing a clean and hygienic workplace, businesses can make a significant positive impact on the health and safety, productivity and satisfaction of employees.Studies have shown that employees in a clean facility are 12% more productive. What would this look like in a panel building shop? It means:• projects are clearly organized and in their own workplace • components are labeled and stored with the correct project • tools and other supplies are clearly labeled and easily accessible • trash and other non-used supplies are removed from the work area regularly • dust, dirt and debris are reduced that could cause a fault within the pane
  4. Do they standardize the layout of the panel? While neatness may be the first thing that jumps out about a well-designed panel, there are other aspects that you should look for in good control panel design. These aspects include component placement, labeling, panel size and space and wire design.• Components should be arranged in a logical and functional manner. High and low voltage components should be segregated from each other. Since most panels have their main power disconnect switch in the upper right of the panel, it makes sense that the highest voltage rating components should be at the top with decreasing voltage level components below. The PLC racks and other sensitive electronics are typically located away from the hotter power components. • Labeling of components, especially wiring, is key and the labelling should be consistent within the panel. Wiring and components should also correspond to the P&ID, that way troubleshooting will be easier down the road. • Panel size and spacing should obviously be large enough to house the needed components, but also allow room for possible future expansion. Proper heat dissipation is also critical within a control panel. A well-design panel will incorporate the means for expelling heat excess vertically within the enclosure. Additional room should also be left at the bottom for coiling spare field wiring. • A good wiring plan uses both the right type and the right amount. Enough space should be given so that each wire can be neatly connected to its component and that its label can be clearly seen. Finally, wiring should be firmly connected so that wiring cannot be easily pulled out or lose connection.
  5. Do they provide documentation with the panel? Last but not least, your automation supplier should provide all of the proper documentation along with the panel itself. At a minimum, documentation should include any layout drawings and/or P&ID’s, electrical schematics and bills of material for the components. If you requested a UL panel, the panel should also include a UL sticker and verification that all components are UL-Certified. Panels should also have a tag that includes the manufacturer and the project number.